After a period of use, the grinding machine needs to be maintained and serviced. If the maintenance and upkeep are not in place, the equipment will malfunction during operation, causing inconvenience to our work, such as blockage during operation. What is the reason for this? Below, the editor will analyze in detail what causes this situation and how to solve it.
Firstly, in terms of feeding, if the feeding is uneven, it will lead to insufficient grinding of the powder mill, and the finished materials cannot be discharged in a timely manner. If the materials accumulate for a long time, it will cause accumulation in the air duct, ultimately causing air duct blockage. Therefore, ensuring uniform feeding is the primary factor to avoid blockage.
Secondly, if the power of the blower is insufficient, it will cause the material to not flow normally in the air duct, resulting in material accumulation. Therefore, it is necessary to ensure the normal operation of the blower during operation to avoid the phenomenon of too low wind force in the blower, which may cause the material to be unable to be transported. Therefore, it is necessary to ensure that the rated power and working voltage are normal during operation, so as to ensure that the equipment can work normally.
CAS
-
>
Ligne de production de ciment de 2500 tonnes par jour
-
>
Ligne de production de ciment silicaté
-
>
Site de broyeur à charbon vertical LM 20 t/h
-
>
Broyeur à charbon, 200 mesh D90 25 t/h
-
>
Projet de préparation de charbon pulvérisé à haut rendement
-
>
Projet de production de poudre de calcaire ultrafine
-
>
Broyeur à rouleaux vertical 50-60 t/h pour le calcaire
-
>
Broyeur vertical LM27-3N, traitement des scories, 325 mesh, 6 t/h
-
>
Ligne de production de clinker de ciment de 1 500 t/j
-
>
Broyeur à charbon, 200 malle, D85, 45 t/h
En savoir plus
Chat en ligne
Laisser un message